Bathroom

re-model

Amman, Jordan - Completed 2023.

Bathroom before

Bathroom After

The bathroom remodel was a four week project, from design to execution, having to look for samples, toilets, bathroom accessories, glass partition, lighting and tiles. The first step was demolishing the floor tiles because we want to have different levels for the walk in shower, so the water doesn’t come out. It was designed to have a smooth transition with a slight change in degree declining towards the shower drain.

The next step was creating a nook in the wall for the shelf, by demolishing an 20 cm in depth and 30 cm in height from the wall brick, Then setting up the piping since we have a wall mounted toilet with a hidden in wall tank from Kohler. and a hidden wall mounted shower head and hidden system from Grohe.

After setting up the piping system, they did the electrical wiring since we have new areas to be lit such as the shelf and hidden ceiling light and above the mirror.

The tiling and gypsum board in ceiling part was the most satisfying part since it felt like 70% of the project was done.

Then hanging the toilet bowl, flush plate, shower head and shower faucet system. Wall accessories like toilet roll holder and towel nooks.

last but not least, The sink with cabinet system was designed with an Off white Corian top with an undermount sink from Kohler, and matte Taupe cabinets. Finally, Adding the frameless glass partition having and accessorizing the bathroom and adding all the necessities needed such as towels, bathroom, etc.……

Project Overview